The transport of the 500,000 pound transformer was stopped early this Monday due to a mechanical failure
1 / 6 | This is what the megatransformer that is being transported to Carolina looks like. LUMA Energy announced in early November that it would transport a megatransformer from San Juan Bay to the Sabana Llana electrical substation in Carolina, an operation that will require temporarily closing eastbound traffic on Roosevelt Avenue. – Ramón “Tonito” Zayas