![]() |
|
| Report Generated: 5/25/2013 at 12:02:33 PM | |
Date Created: 5/25/2013 Detour Number: 785 |
|
|
|
|
|
|
|
|
County
Affected:
Sandusky
and
Seneca
|
Added Length: 17.2 miles
Length of Detour:
29.5
miles
Duration:
Mid October
Detour Route: US 6; US 23; SR 18; SR 224 Remarks: Two bridge structures are getting repairs done. One is at the 1.69mm and one at the 2.39mm. |